Dry fountain installation tips

Views:10     Author:Site Editor     Publish Time: 2021-07-30      Origin:Site

The pools shall be dig underground according to our civil work drawings. Make it waterproof. Precast the water pipe, and the cable pipes from the pool to the control room. All the fonntain equipments are set underground, including the pipes, nozzles, valves, pumps. Concrete or marble covers shall be set on the top. Around 17cm hole opening is needed for each cover for later setting the lights.  The water will go from the hole along the lights beam.