+86 512 66587690      ​ fountain@gofountain.com      +86 512 66581711

How long it takes to install a music fountain?

Views:235     Author:Site Editor     Publish Time: 2019-12-31      Origin:Site

After the site construction work is ready, GOFOUNTAIN's team will go to the site to install the fountain. The specific days needed is based on the site condition and fountain size/design. Normally it will take about 10 - 30 days to install different fountains.